Completed and on going Projects:
Northside parking lot paved
Exterior lighting upgraded/Sidewalk repair/Westside main entrance steps replaced
Sandstone masonry restored
Handicapped and main entrance doors replaced
147 windows replaced and aluminum wrapped
Roof foam covered and poly sealed
Multi purpose room kitchen renovations
Entire building repointed
Interior lighting replaced with more energy efficient fixtures
Kitchenette installed in McCarty Room
Canvas awnings over 4 entrances and handicapped ramp-2013
East and South side parking lot repaved-2014
2nd Floor Northside restroom renovated 2015
Laundry room for tenant use installed-2015
Exterior LED motion lighting installed in various areas-2015
New sinks w/vanities installed in 4 different restrooms-2015
New roof put on equipment shed ( snow blower/lawnmower etc. ) north side 2015
Mulch around entire building refreshed and edged, handicapped ramp and north side entrance painted 2015
Multi Purpose Room repainted-2020
Empire Heater replaced in Room #10-2020
Upcoming Projects:
Kitchen renovations and repainting.
MPR floor repair and repainting in some areas
Roof sealing ongoing